Skip to main content

Cres, CREATOR project, NESOI

Croazia | Estero | Cres

Sinloc SpA

Group Company

Isola di Cres

Benificiary

21 gennaio 2022

Start Date

18 luglio 2023

End Date

Concluso

Project Status
Value
0.65 Mln/€
Instrument
Advisory
Sector
Energy transition
Segment
Public Administration
Progetti europei
Assistenza tecnica
Fonti energia rinnovabile (FER)
Feasibility study for the installation of floating photovoltaic solar panels on the surface of the only freshwater lake on the island of Cres to avoid evaporation and create energy within the European Facility NESOI. The project studies the possibility to install floating solar panels on the lake for self consumption: the electricity produced would cover the consumption of the pumping station.
Get in touch with the team

Interested in this project?

To discuss a similar project of yours or for any information and inquiries, feel free to contact us!

Contact Us

You may also like