Skip to main content

Othonoi, Ereikoussa e Mathraki, JEDI project, NESOI

Grecia | Estero | Antiparos

Sinloc SpA

Group Company

Isola di Othonoi

Benificiary

23 giugno 2021

Start Date

23 luglio 2022

End Date

Concluso

Project Status
Value
3.34 Mln/€
Instrument
Advisory
Sector
Energy transition
Segment
Public Administration
Progetti europei
Comunità energetiche rinnovabili
Assistenza tecnica
Fonti energia rinnovabile (FER)
Feasibility study within the European Facility NESOI for the development of a solution in Othonoi and Ereikoussa that will make them the first Greek islands powered 100% by renewable sources. It also includes the smart transformation of Mathraki Island Port and the creation of a REC. The project foresees the full decarbonization of Ereikoussa and Othonoi islands’ power systems, which are not interconnected with the mainland. The existing diesel-based power stations will be replaced by hybrid power stations combining a wind turbine, a photovoltaic station and a battery system.
Get in touch with the team

Interested in this project?

To discuss a similar project of yours or for any information and inquiries, feel free to contact us!

Contact Us

You may also like